Hombale Group
Portfolio

Our Project Portfolio

A live and historical record of every landmark we have built for government and institutional clients across India.

Completed

Construction of Villa Housing Project and 1BHK Housing project at Sy. No. 35 of Hunnigere Village in Dasanapura Hobli on Lump Sum Turnkey Basis based on Design under Two Cover System

Location
Hunnigere Village in Dasanapura Hobli
Status
Completed
Completed

Construction of 2 BHK Housing Project at Sy. No. 22,23of Konadasanapura Village in Bidarahalli Hobli, Bangalore East Taluk on Lump Sum Turnkey Basis Based on Tender's Own Design under Two Cover System

Location
Konadasanapura Village in Bidarahalli Hobli
Status
Completed
Completed

Construction of 749 Nos. of family quarters ( T-II-700, T-III- 04 Nos, T-IV-30 Nos,T-V-15 Nos) and 3 Nos. of 240 men barracks at Group Centre CRPF, Kadarpur, Gurgaon including W/S, S/I, Internal electrical installation, Fire fighting, Passenger/Goods lifts and Miscellaneous E & M Services

Location
CRPF, Kadarpur, Gurgaon
Status
Completed
Completed

Construction of 2 BHK Housing Project Valagerhalli Phase-VI in Sy. No. 70, 101/3 & 102/2 under Gnanabharathi Layout 1st Block, Kengeri Hobli, Bangalore South Taluk, Bangalore on Lump Sum Turnkey Basis based on Tenderer’s Own Planning and Design under Two Cover System

Location
Gnanabharathi Layout 1st Block, Kengeri Hobli, Bangalore South Taluk, Bangalore
Status
Completed
Completed

Construction of 2BHK Housing Project at Sy No.95 of kanminake Village, Kengeri Hobli Bangalore South Taluk On Lumpsum turnkey Based on tender's Own design under Two cover System Phase 2

Location
Kanminake Village, Kengeri Hobli Bangalore
Status
Completed
Completed

Construction of 2BHK Housing Units at Sy No.115/1 of Kommaghatta Village under Nadaprabhu Kempegowda Layout On Lumpsum turnkey Based on tender's Own design under Two cover System (Phase 3)

Location
Kommaghatta Village under Nadaprabhu Kempe Gowda Layout Bangalore
Status
Completed
Completed

Construction of 938 Nos. Family Quarters (900 Nos. Type-II & 38 Nos. Type-III) and Development Work including Internal Electrical Installation, at GC, CRPF, Amethi(UP) on EPC basis

Location
CCRPF, Amethi (UP)
Status
Completed
Completed

Construction of B, C and D type Residential quarters including allied services (phase - III) for Hindustan Aeronautics Limited (HAL), Bangalore. Sub Head: Construction of 240 nos type B, 80 type C & 24 type D residential quarters including internal water supply, sanitary installations, drainage, development and bulk services, internal electrical installations, service connection, cables & earthing, lightning protection, light fittings including LED fittings, down comer, fire fighting system, fire alarm system, lifts etc.

Location
HAL Bangalore
Status
Completed
Completed

Construction of New Helicopter Manufacturing facility including allied services (phase –I) for Hindustan Aeronautics Limited (HAL),at Bidrehalla Kaval, Gubbi Taluk, Tumakuru district of Karnataka state. Sub head: Construction of various RCC buildings including internal water supply, sanitary installations, drainage, internal electrical installations & fans,earthing, fire extinguisher, lightning conductor,lift, automatic fire alarm system, PA system, CCTV, UPS, VRF AC and Chiller plant,site development including Heli-Runway, Taxiway, Apron, Internal Roads, paths, drains and bulk services.

Location
Bidrehalla Kaval, Gubbi Taluk, Tumakuru district of Karnataka
Status
Completed
Completed

Construction of Renenwable Energy Demonstration park and Corporate Office Building (green Building Complints) at nagarbhavi. Bengaluru.

Location
Nagarbhavi. Bengaluru
Status
Completed
Completed

Construction of New Helicopter Manufacturing facility including allied services (phase –I) for Hindustan Aeronautics Limited (HAL), at Bidrehalla Kaval, Gubbi Taluk, Tumakuru district of Karnataka state SH : Clo Various RCC buildings for Admin Building, IT Building, Executive Canteen. General Maintenance Office and RCC+PEB structure for Holding Store. Outsourcing inspection and various other facilities like Compressor house, Rain water Testing Facility, Scrap yard i/c Internal Electrical Installations, Fire Alarm, Fire Fighting. Specialised

Location
Bidrehalla Kaval, Gubbi Taluk, Tumakuru district of Karnataka
Status
Completed
Completed

Construction of 240nos Type-II Residential buildings including internal water supply, sanitary installations, drainage, internal electrical installation, fans and fittings, Lifts, fire fighting system( Down comer system & fire extinguishers), Manual fire alarm system and development work for CISF 10th Res. Bn. at Lakkur village, Bangalore.

Location
CISF 1Oth Res.Bn. at Lakkur village, Bangalore
Status
Completed
Completed

Construction of R&D wing namely Advanced Polymer Design and Development Research Laboratory (APDDRL), unit of Central Institute of Plastic Engineering & Technology (CIPET), at Aerospace Park, Devanahalli, Bangalore

Location
Aerospace Park, Devanahalli, Bangalore
Status
Completed
Completed

Construction of Building for Centre for Brain Research at Indian Institute of Science Campus, Bangalore

Location
Indian Institute of Science Campus, Bangalore
Status
Completed
Completed

Construction of 192 Nos (64 PC+128 SI) Police Quarters (Stilt +8 Floors)( Block A, B & C ) at Sirsi Circle, Mysore Road in Bengaluru under Police Gruha 2020 Scheme (PG-2020/PH-3/PACKAGE NO. 19/2017-18) on Lump sum Turnkey basis using Alternate technology i.e Mivan technology (Monolithic Construction).

Location
Sirsi Circle, Mysore Road in Bengaluru
Status
Completed
Completed

Construction of Skill Development Centre and hostel blocks at IISc, Challakere Campus, Challakere, District – Chitradurga Karnataka. Sub head -Building Portion including internal water supply, Sanitary installation Drainage Development and bulk services, internal electrical installation, Lifts, AC Systems DG Set, Substations Distributions and cabling, street lighting Water supply Pump sets, Solar Water heater, online UPS, Fore Fighting & Extinguisher, Sewage treatment Plant

Location
Challakere Division, Bangalore
Status
Completed
Completed

Construction of C/o 80 Nos. Type II Quarters for deficient married accommodation i/c intl. W /S,Sf I, drainage, RCC underground sump, Pump House, substations, septic tank, internal roads, Pdg IEI, Street light, Lifts, D.G.Set, EPBX, Down Corner System, Manual FAS, water supply pump sets and sub station etc for Indian Coast Guard at Chicolna, Goa.

Location
Indian Coast Guard at Chicolna, Goa
Status
Completed
Completed

Construction of a RERA Approved residential complex for Army Welfare Housing Organization (AWHO)

Location
AWHO Mysuru
Status
Completed